Application Documents – July 2018

Volume 1: Written Statement

Chapter1       Introduction
Chapter4       Planning Policy
Chapter6       Socio-economics
Chapter7       Traffic and Transport
Chapter8       Noise
Chapter10     Cultural Heritage
Chapter11     Ecology
Chapter12     Ornithology
Chapter13     Hydrology and Hydrogeology
Chapter14     Geology and Soils
Chapter16     Air Quality and Dust
Chapter17     Shadow Flicker
Chapter18     Infrastructure
 
Volume 2: Figures
1 – Introduction
 
2 – EIA Process
 
3 – Description of the Proposed Development
 
6 – Socio Economics
 
7 – Traffic and Transport
 
9 – LVIA
9.2a Aerial
 
10 – Cultural Heritage
 
11 – Ecology
 
12 – Ornithology
 
13 – Hydrology & Hydrogeology
 
14 – Geology & Soils
14.3 Soils
14.6A Peat Depth
14.6B Peat Depth
14.6C Peat Depth
 
15 – Peat Slide Hazard Risk Assessment
15.1A-C Geomorphology
 
16 – Air Quality and Dust
 
Volume 3: LVIA Figures
Figure 9.32a-g      Viewpoint 7: Cruach nan Caorach
Figure 9.34a-g      Viewpoint 9: Beinn Mhor
Figure 9.36a-d      Viewpoint 11: Kyles of Bute
Figure 9.37a-g      Viewpoint 12: Beinn Ruadh
Figure 9.44a-c      Viewpoint 19: Arran, Lochranza Pier

 

Volume 4: Appendices
2 – EIA Process                                                
 
3 – Description of the Proposed Development
 
7 – Traffic and Transport
 
9 – LVIA
 
11Ecology
 
12 – Ornithology
 
13 – Hydrology and Hydrogeology
 
14Geology and Soils
 
15Peat Landslide Hazard and Risk Assessment
 
18 – Infrastructure

 

 
 
 
Appendix 1  PoAN
Appendix 2  Newsletters
Appendix 10  VYO COD1, VYO COD2
Appendix 12  SP=EED Framework

 

Scoping Report

The Scoping Report for Ardtaraig Wind Farm has now been submitted to Argyll and Bute Council. To view the Scoping Report, please click the link below:

Scoping Report

Community Open Day Information Boards

Copies of the information boards from the second round of Community Open Days, held in the Autumn of 2017 can be found below.

Open Day Text Panels

Landscape and Visual Panels*

Copies of the information boards from the first round of Community Open Days, held in the Spring of 2017 can be found below.

Open Day Text Panels

Landscape and Visual Panels*

*These panels have been reduced in size in order to make them more easily downloaded – if you’d like larger versions, please get in touch.

Newsletter

Infinergy will send a newsletter to residents in the area around the proposed wind farm site to invite them to the Community Open Days. The newsletter will be available to view here.

Ardtaraig Newsletter February 2017

Ardtaraig Newsletter October 2017